Plan for the 45 min Live Dive Broadcast (one broadcast at 1100 and one at 1400): 1100-1105 -Opening remarks by Ivar Babb 1105-1110 -Rise up from the seafloor along the edge of the bow to the top of the wreck -Move aft along port side for 10 feet -Move to inside the bow to show the anchor windlass and anchor chain -Move aft along the centerline of the vessel 1110-1120 -Explore the steering mechanism and steam piping -Move aft to the staircase opening and look down into the hole briefly -Continue moving aft showing the deck planking 1120-1130 -Move toward the port side edge of the wreck and catch the cup -Follow the wreck’s port side edge stopping to look at the stowed anchor and bitts -Continue aft and stop to show the exposed deck beams and small steam release pipe 1130-1140 -Move aft to show the auxiliary boiler -Move inside the hull and up to show the top of the boiler uptakes -Follow ghost gear up to the walking beam and A-frame -Move back down the uptakes to the outer edge of the port side -Move aft to show the port paddle wheel hub 1140-1145 Closing remarks by Ivar Babb